The renovation plan for the primary school “St. Kiril and Methodius” was developed in the framework of the EuroPHit project (https://europhit.eu/) co-funded by the Intelligent Energy Europe Programme of the European Union. The renovation plan follows a Step-by-Step Business Model approach, aiming at achieving the EnerPhit standard, based on the Passive House principles.
The building was constructed in 1970. It has a concrete structure with external brick walls and a concrete flat double ventilated roof, and no insultaion was installed. Since 2013, the school has been connected to the central gas heating.
The renovation work included improvement of the building envelope with new thermal insulation on the roofs, on the external walls, on the ground walls and the slabs on the ground. Furhtermore, the windows were exchanged when their lifespan was over.
The project proposed the following refurbishment steps:
The renovation of the buildings according to the EnerPHit standard can increase the effect of energy efficient refurbishment by more than 25 %. In addition to improved energy efficiency, better air quality can be achieved : the initial air change rate was 0,6 1/h , which led to uncontrolled use of the natural ventilation, high heat losses and low air quality, especially in schools and kindergartens. Mechanical ventilation with heat recovery improves air quality and energy efficiency at the same time.
The municipality of Gabrovo aimed to be a leader in defining NZEB criteria. In 2013, the first Passive House in Bulgaria was built in Gabrovo – kindergarten Sun.
With this project, the local authorities intended to create a model for refurbishment of an old building to the level of the new NZEB standard. Choosing a school as pilot project, the municipality wanted to set an example to be followed and to raise the awareness of the community.